ADU (accessory dwelling unit) builder in Gig Harbor, Washington

Gig Harbor is a Pierce County city on the peninsula, and city lots follow GHMC 17.69. A Gig Harbor mailing address can still be in unincorporated Pierce County, so we confirm that first.

White Wolf cottage with a covered porch at Orchards District Cottages in Vancouver, Washington
Gig Harbor, Washington — Wolf employees handle the project from permits through installation.

Getting started

Let’s start with your plans

  • City: up to two ADUs per principal dwelling, 1,200 sq ft excluding related garages (GHMC 17.69).

  • Ordinance 15-41 implemented HB 1337. Confirm the current city code when you file.

  • Peninsula and shoreline lots may be in unincorporated Pierce County. Check the city’s Harbor Atlas or county GIS first.

Gig Harbor sits on the Pierce County peninsula, looking back at Tacoma across the Narrows. It’s a harbor town with a working waterfront, a steep downtown, and a lot of mailing addresses that aren’t actually in the city. City of Gig Harbor is one reviewer. Unincorporated Pierce County is another. Shoreline (PAC) parcels can add a third review. The mailing address doesn’t tell you which applies.

Our factory is in Battle Ground, near Vancouver, WA. Delivery runs up I-5 to SR-16 across the Tacoma Narrows, the same bridge we use for Bremerton sets, then north onto the peninsula. We don’t have a Gig Harbor case study in the library yet, but the city is inside our Washington turn-key area, and we review lots here the same way we do in Tacoma.

City of Gig Harbor or Pierce County first

Look up the parcel. The city points owners to Harbor’s Atlas on gigharborwa.gov, or to Planning at 3510 Grandview Street, (253) 851-6170. If the lot is inside city limits, GHMC Title 17 applies. If it isn’t, you’re in Pierce County, even when the mail says Gig Harbor. Artondale, parts of Purdy, Fox Island, Wollochet, and a lot of shoreline acreage share the mailing address but not the permit office.

Washington law allows two ADUs on qualifying properties in urban growth areas. The available space, utility capacity, and any protected areas still affect what you can build. Read the Washington ADU laws guide. The city or county reviews the site plan and issues the permits. We coordinate that process for your project.

Ordinance 15-41, adopted April 28, 2025, implemented HB 1337 in Gig Harbor and created GHMC 17.69. The city’s Accessory Dwelling Units client assistance memo (ADU CAM) is the one-page summary we use on evaluations (confirm it when you file):

  • ADUs are permitted outright in all residential zones that permit single-family homes, with a new or existing principal dwelling.
  • Configuration: within, attached to, or detached from the principal dwelling. Principal dwellings include a single-family unit, duplex, triplex, townhome, or other housing unit.
  • Density: up to two ADUs per principal dwelling. ADUs are exempt from the density requirements of the underlying zone.
  • Minimum lot size: any legally established parcel that meets the minimum lot size of the zoning district for the principal dwelling.
  • Maximum unit size: gross floor area, finished wall to finished wall, shall not exceed 1,200 square feet, excluding related garage area.
  • Minimum unit size: Washington State Building Code.
  • Setbacks and lot coverage follow the primary structure, not accessory-structure setbacks.
  • Parking: in addition to spaces required for the primary residence, and except when the property is within one-half mile of a major transit stop, off-street parking for ADUs follows GHMC 17.72.
  • Design: attached or detached ADUs conform to GHMC 17.99 design standards.

The memo is a summary, and GHMC 17.69.030 is the actual code section. Check it the week you file.

Unincorporated Pierce County doesn’t use GHMC 17.69. Shoreline parcels and some peninsula lots go through Pierce County Planning and Public Works, sometimes with shoreline (PAC) review as well. We confirm the reviewer first, and we don’t apply Gig Harbor’s 1,200-square-foot city cap to a county rural lot.

Setbacks differ between R-1, R-2, and the planned-community districts, so we don’t quote a citywide number. Slope and view easements can also shrink a backyard that looks generous on the zoning map.

How Gig Harbor takes a permit

Gig Harbor Planning wants the design-manual sheets in the first submittal. Incomplete site plans and unresolved access comments are the usual reasons a file comes back. Here’s the order we work in:

  1. Confirm on Harbor’s Atlas that the taxlot is in the City of Gig Harbor, and not Pierce County or a shoreline-only file.
  2. Confirm the zone allows a single-family (or other listed principal) dwelling, then apply GHMC 17.69.
  3. Plot plan: existing house, proposed cottage, primary structure setbacks, lot coverage, parking, utilities, and a truck or crane path that works downtown or on a Point Fosdick driveway.
  4. Engineered modular plan set. These are modular homes under the Washington State Building Code, inspected by L&I in the factory. They ship with an L&I factory insignia and are not HUD (the federal standard for manufactured homes) manufactured homes. Gig Harbor still reviews the foundation, placement, utilities, and GHMC 17.99 design.
  5. Submit to the city (or Pierce County if unincorporated) with utility connection plans. Site prep is part of the job.
  6. Inspections as called, then occupancy. Keep the approved drawings on site.

A typical city submittal includes the application, a site plan with property lines and setbacks, floor plans, how water and wastewater will be handled, parking, and elevations that can be checked against 17.99. The Building Division uses the same 253-851-6170 number listed on the CAM. Washington L&I inspects the module in the factory, and Gig Harbor inspects the foundation, placement, and utility connections.

If the lot is outside city limits, the CAM doesn’t apply. Start with Pierce County, plus shoreline review if the parcel is in that overlay. A five-acre wooded lot above the harbor can look like it’s in the city and still file as county.

Lots we see

Downtown Gig Harbor still feels like a maritime town. The harbor-facing blocks can be tight, with short lots, steep driveways, on-street parking, and view corridors that are hard to get a truck through. Canterwood and some planned-community plats are wider but have HOA (homeowners association) packets, tree retention, and private-road rules. The uplands in general have views, HOA requirements, and driveways that look generous until a module is on them. Point Fosdick, Wollochet, and the Artondale area mix city, county, and shoreline lots. Purdy has its own last mile off SR-16.

Harbor-adjacent and low parcels raise flood, geotech, and shoreline questions. Shoreline setbacks and base-flood elevations come from the county maps and a surveyor. If you know the lot is in a shoreline overlay, tell us, and don’t assume a wooded shoreline lot is an automatic ADU site.

Delivery across the Narrows

The route from the factory is I-5, the Narrows bridge, and SR-16 north. Bridge wind restrictions and oversize timing go on the schedule. A 12-foot-wide Model K is easier to get in than a 14-foot E on a street with parking on both sides. Overhead lines, firs, and a driveway built for a passenger car still decide the day.

From SR-16, Harborview, Point Fosdick, and the numbered streets off Pioneer are each different last miles. A single-module home is a morning’s work when the path is clear. A two-piece home on a dead-end street near a school needs a different plan. We schedule around downtown event days so they don’t catch anyone off guard.

Tacoma is across the bridge and runs its own permit counter. Bremerton is across the water in Kitsap County. Fox Island is nearby and usually a Pierce County file.

Models under the 1,200-square-foot cap

Wolf doesn’t sell HUD-code manufactured homes, and a home on wheels doesn’t count as an ADU here.

  • Model K (~432 sq ft). A one-bedroom layout to consider after reviewing the hillside pad or downtown side yard. Its footprint alone does not establish fit.
  • Model E / Model F (~616 sq ft). Two bedrooms, well under the 1,200-square-foot city cap.
  • Model L (~984 sq ft) and Model J (~828 sq ft) when coverage and height still allow a larger cottage. Model I (~1,232 sq ft) is over 1,200 as published, so it would need a different permit path unless the city measures it at a number that fits.

The 1,200-square-foot cap excludes related garage area. Don’t count a garage under the cottage as free square footage until the city confirms how it measures. Measure first.

ADU, tiny home, or guest house

If it has a kitchen and bath, Gig Harbor treats it as a dwelling. Family use and long-term rental are the usual choices. Short-term rentals fall under a separate city chapter (GHMC 17.85), so don’t assume an ADU permit covers a vacation rental. Tell us the intended use on the evaluation.

Cost and timeline

The model sets the starting home price. Trench length, retaining, electrical capacity, matching siding to the design manual, and the haul across the Narrows set the rest. Building indoors keeps the home out of the peninsula rain, but city review and site prep still drive the schedule.

The Model K starts at $85,500 for the home itself. Permitting, delivery, installation, and site work are listed separately in your property-specific proposal. A harbor hillside that needs retaining will cost more than a level lot with short laterals, so we provide a complete proposal after a property evaluation. See the Washington ADU cost guide.

Utilities

Most in-city Gig Harbor lots are on city or district water and sewer. You still need to check lateral length, cleanout location, and whether the electrical service can carry a second dwelling without a panel upgrade. Outside the city you may be on a district system, a well, or septic, where county and shoreline rules plus septic design usually decide the project. If you don’t know which you have, it’s the first thing we check.

Site work and weather

The peninsula is wet from fall through spring. The house is built indoors, but on the lot, glacial till, slope, and winter water affect excavation and erosion control. Summer is the easier set window. Winter sets happen too, with tighter site controls. Wind off the harbor can limit what the crane can lift on set day.

Foundation excavation, trenching, grading, and minor tree work are part of a normal Gig Harbor job. A downtown alley that looks like a delivery path, or a Point Fosdick driveway built for a passenger car, is why we measure access early. We bring a standard delivery trailer, and a crane when the swing needs it. We weather-seal the same day when we can, then finish mechanical and plumbing tie-ins. Two-piece plans add a day to join the halves.

Financing is usually a HELOC, cash-out refinance, or a construction-to-permanent lender who has worked with factory-built ADUs. See financing.

What to send

An address is enough to start. Useful extras: a Harbor’s Atlas or Pierce County GIS printout, a survey, a prior planning letter, photos of the backyard and the street approach, your HOA design packet if you have one, and whether the unit is for family, long-term rental, or a cottage you might live in. We check city, county, or shoreline jurisdiction, the 1,200-square-foot cap, parking, and whether a truck can reach the pad.

If you’ve already picked a model, we’ll still check it against the 1,200-square-foot cap and the zone’s coverage before treating it as the plan.

After the set

Inspections, walk-through, punch list, keys, and the warranty packet. Because the factory is on the other side of the Narrows, follow-up visits are scheduled trips. Gig Harbor inspectors sign off on occupancy for city lots, so keep the approved drawings on site until they do.

Send the address. Tell us city, county, or shoreline if you know, where the building would sit, and whether it’s for family, rental, or you. We’ll match a model to GHMC 17.69, or to the county rules if your lot turns out to be in Pierce County.

Find your home

Room for the way you live

Compare bedrooms, living space, and the details that matter to you. We’ll help you choose a layout that works with your property.

Planning your budget

The home is one part of the project

Home starting prices outside Portland begin at $85,500 for Model K. Availability and property fit need review.

Starting prices cover the home itself. Your property proposal covers the work needed around it.

Site work, foundation, utility connections, delivery, and installation are quoted for your property. Your written proposal defines the scope, taxes, appliances, and any additional work.

Part of your project How it is priced
Starting price for the home $85,500 (Model K, home only)
Appliances and selected upgrades Priced separately in your proposal
Permitting and local fees Confirmed for your jurisdiction and project
Delivery and installation Quoted for your address, access, and placement needs
Foundation, site work, and utilities Quoted after reviewing the property

Your proposal shows the home price and site work separately. Trench length, septic or sewer work, electrical upgrades, access, foundation, ramps, and delivery distance are reviewed for your property. Taxes, appliances, and work outside the agreed scope are priced separately.

Around the area

Building near Gig Harbor?

Your questions

Building in Gig Harbor

How much does a Wolf ADU cost in Gig Harbor?

Home starting prices outside Portland begin at $85,500 for Model K. Compare the models and home starting prices available for your location. Appliances are not included in the base price. You can purchase our appliance package or provide your own. Permitting, delivery, installation, foundation, utilities, site work, taxes, and upgrades are quoted separately. Installation availability depends on the service area; some locations require a local contractor. Send your address so we can explain the scope for your project.

What’s the difference between an ADU, a tiny home, and a modular home?

An ADU (accessory dwelling unit) is a legal second dwelling on a lot that already has a house — people also call it a granny flat, backyard apartment, or backyard cottage. “Tiny home” usually describes size. Wolf’s smallest widely available plan is the 432-square-foot Model K; the 307-square-foot Model B is limited to the City of Portland. “Modular” describes the construction method: Wolf homes are built to IRC/IBC (International Residential Code / International Building Code) residential code, inspected by Washington L&I or Oregon BCD, and installed on a permanent foundation. They are not HUD manufactured homes.

How big can an ADU be in Gig Harbor?

GHMC 17.69 and the city’s ADU client assistance memo cap gross floor area at 1,200 square feet, excluding related garage area. Up to two ADUs may be created with each principal dwelling. Confirm the current GHMC when you file.

Is a Gig Harbor mailing address always the city?

No. Look up the parcel on Harbor’s Atlas or Pierce County GIS. A Gig Harbor address can be in city limits, in unincorporated Pierce County, or in a shoreline overlay with a different reviewer. Fox Island, Artondale, and parts of Purdy share the mailing address but not the permit office.

Have you set a Wolf home in Gig Harbor?

There's no Gig Harbor case study in our library yet. The city is inside our Washington turn-key area, and we review lots here the same way we do in Tacoma and Bremerton. Send the address and we'll start with jurisdiction and the 1,200-square-foot cap.

Which official pages should I read?

Harbor’s Atlas for zoning, GHMC 17.69 and the city’s ADU CAM for city lots, City of Gig Harbor Planning Division (3510 Grandview Street), and the Washington ADU laws guide for HB 1337 and L&I modular inspection. Unincorporated lots use Pierce County, not GHMC 17.69.

What does Wolf handle for a Gig Harbor project?

Wolf employees handle property review, design, permitting, factory construction, site work, delivery, installation, and warranty within the agreed project scope. Some projects require third-party services, such as surveys or septic design and installation, depending on the property and jurisdiction.

One point of contact

Atlas, GHMC 17.69, and a Gig Harbor delivery

Gig Harbor city lots and peninsula Pierce County lots have different reviewers, even when the mailing address is the same. Wolf checks Harbor’s Atlas against county GIS, supports the GHMC 17.69 packet on city lots, handles site work, builds the home in our factory, and hauls it across the Tacoma Narrows, all on one schedule.

Shoreline parcels can need a separate review, so send us the taxlot along with the address.

Start a free property evaluation.

See what fits on your Gig Harbor property

Share your address and a little about the home you have in mind. We’ll help you understand the space, the work involved, and your next step.

4.9 · 117 Google reviewsVerified on Google Maps September 14, 2026
Where on the property have you pictured it?

The spot you enjoy most is a good place to begin the conversation. Then we check the local rules, the delivery path and utility connections. A mailing address alone doesn’t tell us which jurisdiction reviews the project.

Tell us about the property →
Ask Wolf

Ask Wolf

A little help finding your home.

Ask about Wolf homes, rentals, your property, or caring for your home. Answers link to Wolf’s published information.

AI-assisted answers. Please leave out personal details.