Skip to main content
Search
Contact Us
Menu

Modular ADUs

Modular ADU (accessory dwelling unit) Builder

A modular ADU adds space, rental income, or room for family without a months-long build in your yard. It is a complete dwelling built indoors, delivered to your backyard, and set on a permanent foundation. Wolf employees handle your project from permits through installation, with specialist services brought in when needed.

Our free preliminary study reviews zoning, setbacks, and what is generally allowed on your site. Paid project work begins after an agreement is signed and you choose to move forward.

Where Wolf works

In Washington and Oregon our own crews do the work. When your lot needs a survey or septic design, we line that up too. Full details →

Delivery options and state requirements →
Finished Wolf Industries Model E two-bedroom modular home on a Pacific Northwest lot

The basics

What is a modular ADU?

An ADU (accessory dwelling unit) is a small, independent home on the same lot as a primary house, with its own kitchen, bathroom, sleeping area, and living space. A modular ADU is built off site in one or more factory sections, called modules, with the same materials and residential codes as a site-built home. It is then delivered, set on a prepared foundation, and connected to water, sewer or septic, and power. Wolf builds detached modular ADUs; converting a garage or basement is work for a different kind of contractor.

Who it’s for

Why homeowners choose modular

Owners who value an indoor factory build

The structure is framed, wired, plumbed, and finished in Battle Ground under state factory inspection. Your city inspects the site work, not the sealed structure.

Family or rental use on a known timeline

Shop production is typically a few weeks once the home enters the schedule. Permitting and site work usually take longer, and the city or county still reviews the property work.

People comparing modular vs stick-built vs HUD (the federal standard for manufactured homes)

Modular is residential code IRC/IBC (International Residential Code / International Building Code). Stick-built is the same code, assembled outside. Manufactured is HUD code. Those three finance, insure, and permit differently.

Owners who want less construction in the yard

The home is built in the factory while the foundation and utilities are prepared on site. Framing, wiring, and finishes do not happen in your backyard or wait on the weather.

People who value consistent, inspected work

The same crews build every home indoors, on a set sequence, out of the weather. The state inspects the structure before it leaves the plant.

Households that want it to fit their life

One- and two-bedroom plans, a Model L plan we can adjust for accessibility, and finish choices from the Options Book. You customize within a proven plan instead of starting from scratch.

What Wolf builds

How a Wolf modular ADU is treated

A modular ADU is built to residential code, unlike a HUD manufactured home. In Washington, Labor & Industries approves factory plans and issues an insignia when the structure meets code. In Oregon, the Building Codes Division Prefabricated Structures program does the equivalent. Local building departments then permit placement, foundation, and utilities, and the two reviews can run at the same time.

Engineered to residential code

Same structural, energy, and dwelling standards as a site-built house, checked by state inspectors in the factory.

Turn-key on the property side

In Washington and Oregon we do not hand you a module and a punch list of local contractors. Evaluation, packet, site work, set, and warranty are Wolf’s. Outside Washington and Oregon, the home still comes from our factory, and a local contractor handles the site work. We have delivered homes to California. Each new project needs additional state energy and housing reviews, known as Title 24 and HCD. Wolf builds and delivers the home; local contractors prepare the land and connect utilities. We check local rules and delivery access before recommending a plan or timeline.

Customizable within proven models

Finishes, roofs, and layout options come from the Options Book. Pre-engineered plans keep a small home easier and faster to permit.

Building a modular ADU in Oregon

Oregon cities set their own size limits and system development charges, so the budget changes from one city to the next. Start with ADU costs in Oregon, then read our local notes for Portland, Salem, Eugene, and Bend.

Process

Factory track and site track

  1. 1

    Review the lot first

    Jurisdiction, setbacks, access, and utilities determine whether a modular ADU can work on the parcel.

  2. 2

    State insignia

    The home is built and inspected in the plant. It leaves with the state tag that local inspectors rely on.

  3. 3

    Local placement permit

    Foundation, setbacks, laterals, and final occupancy stay with the city or county.

  4. 4

    Set day

    The module is placed, anchored, connected, and tested. You get keys and the warranty packet.

Models

Modular ADU starting points

Every Wolf model is modular. These three are the usual accessory-dwelling starting points.

Questions

Frequently asked questions

What is a modular ADU?

A modular ADU is a small, complete second home built in factory sections to residential code. It is delivered to your lot, set on a foundation, and connected to utilities. Wolf builds detached modular ADUs.

Is a modular ADU the same as prefab?

Prefab is an umbrella word. Wolf modular homes are factory-built to residential code and set on a permanent foundation. That is not the same as a panelized kit or a HUD manufactured home. See prefab ADUs for how a prefab ADU is permitted and priced.

Will my city re-inspect the factory work?

Generally no for the sealed structure. Local inspectors focus on foundation, placement, and utility connections.

How long does factory production take?

Permitting typically takes 1 to 9 months. Factory construction takes 2 to 3 weeks once your production slot begins. Delivery and setup take 12 to 16 weeks. These are stage allowances and can overlap.

Do you only build modular ADUs?

We also set cottages and small primary homes from the same factory. If the use is a second dwelling on a residential lot, it is usually permitted as an ADU. See Wolf modular homes for primary-home plans.

Why choose a modular ADU instead of building on site?

Less time in your yard, less exposure to weather, and a consistent build. Once the permit is issued, the structure is built indoors while your site is prepared, so those two tracks overlap. A modular ADU is not automatically cheaper: site work, utility fees, and permitting still vary by lot. Compare prefab vs. stick-built and what a Wolf ADU costs.

What can a modular ADU be used for?

Housing for a parent or adult child, a guest house, a long-term rental, a home office or studio, or a smaller home you move into yourself. Short-term rental use is a separate local approval, so tell us the intended use at the evaluation.

Does a modular ADU still need permits and zoning approval?

Yes. Like any dwelling, it has to meet local zoning: whether ADUs are allowed, size and height limits, setbacks, and parking. Wolf prepares and files the permit, coordinates inspections, and handles the factory approval. Start with the Washington ADU laws or Oregon ADU rules guide.

Check your lot for a modular ADU

Send the address and tell us who the home is for. Our free preliminary review covers zoning, setbacks and what is generally allowed. We explain the next step; detailed site investigation and permit approval follow separately.

Talk with Kelsey, Kirsten, or Lars. They’ll look at your property and answer questions until the choice is clear.

4.9 · 120 Google reviews
How does this apply to the home you have in mind?

General guidance is a starting point. Your property, local requirements and the way you want to live help narrow it down. Tell us which part you’re trying to work out, and we can start there.

Ask about your project →
Ask Wolf