ADU (accessory dwelling unit) builder in Marysville, Washington

Marysville sits north of Everett on I-5. City lots and Snohomish County lots are reviewed by different offices. Delivery is a long I-5 run from our factory, so we take a Marysville job only when we can also provide warranty service at that distance.

Wolf modular cottage with cream siding, a shed roof, and ramp entry in Oregon City, Oregon
Marysville, Washington — Wolf employees handle the project from permits through installation.

Getting started

Let’s start with your plans

  • The City of Marysville and Snohomish County have separate permit counters, and an Everett-adjacent mailing address can be in either.

  • Inside the UGA, HB 1337 sets the state minimum. Confirm the current city ADU handout.

  • We don’t have a Marysville case study yet. Send us the parcel and we’ll review it.

Marysville sits north of Everett on I-5, between the Snohomish River sloughs and the Arlington plateau. It’s Snohomish County’s second-largest city, with its own government separate from both Everett and Tulalip. City of Marysville Community Development reviews lots inside city limits, and Snohomish County Planning and Development Services (PDS) reviews the rest. A “greater Everett” or Smokey Point mailing address could be in either one, in Arlington, or on the reservation, so pull the parcel first.

Our factory is in Battle Ground, in Southwest Washington near Portland, and a Marysville set is a long I-5 run past Olympia, Tacoma, Seattle, and Everett. The distance is built into the quote, and warranty visits are scheduled return trips. We take the job when the route, the pad, and the permit file make that haul worthwhile.

We don’t have a Marysville case study in our library yet. Everett has a different permit portal and different rules, so an Everett project doesn’t tell you much about a Marysville lot.

City of Marysville or Snohomish County

Inside city limits, Community Development at 501 Delta Avenue handles it (360-363-8000). The current Accessory Dwelling Unit Standards FAQ is the handout we use on evaluations, and MMC 22C.185 is the code (Ord. 3351 and 3367, 2025). Confirm both when you file.

Outside the city, Snohomish County PDS is the reviewer, and PDS runs paperless on its own permit portal. Lake Stevens, Arlington, and Everett have their own city halls. Tulalip is a separate jurisdiction, and a Marysville ADU packet doesn’t apply to a reservation parcel.

Washington law allows two ADUs on qualifying properties in urban growth areas. The available space, utility capacity, and any protected areas still affect what you can build. Read the Washington ADU laws guide. Marysville’s 2025 amendments put those requirements into effect and add local detail, and Marysville reviews the site plan and permit application.

From the current city FAQ and MMC 22C.185 (confirm at filing):

  • On a single-family lot that meets the zone’s minimum lot size: two ADUs, as one attached and one detached, two attached, or two detached (in one or two structures).
  • No owner occupancy requirement.
  • Short-term rental of the ADU is prohibited.
  • Minimum size: 200 square feet gross floor area.
  • Maximum size: 1,000 square feet or 50 percent of the total floor area of the single-family residence, whichever is greater, and in no case more than 1,400 square feet. Gross floor area excludes garages, porches, and unfinished basements. The director may allow larger ADUs in limited conversion and dimension cases listed in the chapter.
  • Maximum two bedrooms per ADU.
  • Height: 30 feet.
  • Side setback 5 feet; side-street setback 10 feet on non-arterials and 15 on arterials; rear setback 15 feet, reducible to 10 feet for one-story structures or in a PRD. Front setbacks follow MMC 22C.010.080 (or 22G.080.080 in a PRD).
  • Five feet of separation between structures, plus a 5-foot paved path from the ADU’s front entrance to the addressed property line for emergency access.
  • Parking: one space per ADU. No parking areas other than driveways in front yards, and alley-adjacent lots take parking from the alley.
  • Separate water and sewer connections, shown on the site plan (MMC 14.03), with a conversion exception if the building official finds separate connections impracticable.
  • A Land Disturbing Activity (LDA) permit if the project proposes two ADUs, requires frontage improvements, or adds 2,000 square feet or more of new or improved impervious surface.
  • Exterior materials, roof form, and window spacing have to match the existing house. A detached ADU may not have axles or sit on a chassis.
  • Existing structures, including detached garages, can be converted even if they don’t meet current setback or coverage rules. Alley-abutting DADUs (detached accessory dwelling units) can sit at the lot line.

On middle-housing lots, the two-ADU allowance is tied to density under MMC 22C.010.080, and the ADUs count toward that density. Critical-area portions of lots and certain impaired-watershed parcels are excluded from the state-floor provisions, consistent with RCW 36.70A.681.

Unincorporated Snohomish County doesn’t follow MMC 22C.185. County rural and UGA rules are different, so Marysville’s 1,400-square-foot ceiling, two-bedroom cap, and short-term rental ban only apply to a county lot if the county code says so.

We don’t quote a citywide front setback here, because standard lots and PRD lots use different tables. Slope and Ebey Slough and Quilceda Creek drainage can take up a lot of a backyard even when the zone looks generous on paper.

How Marysville takes a permit

Marysville will send the file back if the elevations don’t match the house, and incomplete utility letters or a missing LDA permit will hold it up. Here’s the sequence we use:

  1. Confirm the tax lot is in the City of Marysville, and not in the county, Arlington, or Tulalip.
  2. Confirm a single-family (or qualifying middle-housing) principal dwelling exists or will exist. MMC 22C.185 doesn’t allow the ADU to be built first.
  3. Match a model to 1,000 square feet or 50 percent of the house, capped at 1,400, with no more than two bedrooms.
  4. Draw the plot plan: existing house, proposed cottage, setbacks, the 5-foot separation and emergency path, parking, separate water and sewer, and a truck or crane path that works on State Avenue or a Getchell driveway.
  5. Prepare the engineered modular plan set. These are modular homes built to the Washington State Building Code and inspected by L&I in the factory, so each one leaves the plant with an L&I insignia. They aren’t HUD (the federal standard for manufactured homes) manufactured homes, and they don’t sit on a chassis. Marysville still handles the foundation, placement, utilities, and the appearance standard.
  6. Submit to the city (or Snohomish County PDS if unincorporated), including an LDA application if the project crosses that threshold.
  7. Schedule inspections as called, then get occupancy. Keep approved drawings on site until the inspector signs off.

A city submittal usually includes the application, a site plan with property lines, setbacks, separate water and sewer laterals, and parking, floor plans, utility connections, and elevations that can be compared with the existing house. If you’re converting an existing structure, tell us, because the setback waiver only applies to conversions.

Lots we see

The older grid near downtown and State Avenue can be tight, with short lots, alleys, overhead lines, and houses close to the property line. Lakewood and the east-side plats are often wider but still come with HOA (homeowners association), tree, and drainage questions. Smokey Point and Getchell mix city and county parcels, and a lot that looks like county can be in the city, or the reverse, so check GIS first. Lots near Ebey Slough and Quilceda Creek raise flood and geotechnical questions. We don’t publish base-flood elevations here, so if you know you’re in a flood overlay, tell us.

Models

Wolf doesn’t sell HUD manufactured homes, and Marysville’s handout rules out axles and chassis anyway.

  • Model K (~432 sq ft). A one-bedroom backyard home for a parent, a guest, or a long-term renter.
  • Model E / Model F (~616 sq ft). Two bedrooms, which is the city’s cap per ADU, so this is the usual two-bedroom plan.

Model J (~828 sq ft) and Model L (~984 sq ft) both come in under the 1,000-square-foot floor, so size isn’t the issue for them; setbacks, coverage, and access are. Model I (~1,232 sq ft) needs a primary house large enough that 50 percent (capped at 1,400) still covers it, plus the lot coverage and truck access to match. Three-bedroom plans run into the two-bedroom ADU cap, so an I needs the city to agree on the bedroom count.

The 1,000-square-foot floor matters on smaller houses. If the house is 1,600 square feet, 50 percent is only 800, but because the rule takes whichever is greater, a Model J still fits under the size limit. We measure the house first. If you’ve already picked a model, we still check it against the 1,000 / 50 percent / 1,400 limits and the two-bedroom cap before treating it as the plan.

ADU, tiny home, or granny flat

If it has a kitchen and bath, Marysville treats it as a dwelling. Family occupancy and long-term rental are the usual uses. Short-term rental of the ADU is prohibited under the current city FAQ. County lots have their own use rules. Tell us the intended use on the evaluation.

Cost and timeline

The model sets the starting home price. Trench length, separate utility connections, LDA work, electrical capacity, and the long I-5 haul determine the rest. Building indoors protects the home from Puget Sound rain, but city review and site preparation still affect the schedule.

The Model K starts at $85,500 for the home itself. Permitting, delivery, installation, and site work are listed separately in your property-specific proposal. A Marysville delivery is a lot farther than the 20 miles the flat delivery rate covers, so the delivery line is part of the proposal after a property evaluation. See the Washington ADU cost guide. Financing is usually a HELOC, a cash-out refinance, or a construction-to-perm lender who has worked with factory-built ADUs. See financing.

Utilities

Most in-city Marysville lots are on city water and sewer, and the ADU handout requires separate water and sewer connections on the site plan. That still leaves lateral length, the cleanout location, and whether the electrical service can handle a second dwelling without a panel upgrade. Outside the city you may be on a water district, a well, or septic, and county rural rules plus septic design usually decide those parcels. If you don’t know which utilities serve your lot, that’s the first thing we check.

Delivery, weather, and the set

Delivery from the factory is I-5 the whole way, past Seattle traffic and through Everett, then onto a Marysville arterial. State Avenue, 88th, 4th, and Getchell are each a different final approach, and school traffic and interchange congestion go on the schedule. Oversize-load timing matters. A 12-foot Model K is an easier street-use permit than a 14-foot Model F, and on a dense lot we measure the crane path before we commit to a two-bedroom.

In town, the usual obstacles are overhead lines, firs, and a 24-foot street with parking on both sides. A single-wide can be set in a morning when the path is clear, and a two-piece home on a dead-end with school traffic needs its own plan.

Snohomish County is wet from fall through spring. On site, silts, slough-adjacent groundwater, and winter rain affect excavation and erosion control. Summer is the easier set window, and winter sets take tighter site management.

Site work covers foundation excavation, trenching, grading, and minor tree work. Two ADUs, frontage work, or 2,000 square feet of new impervious surface can trigger an LDA permit, which is why we count driveways and pads early. On set day we use a standard delivery trailer, plus a crane when the swing requires one. We weather-seal the same day when we can, then complete the mechanical and plumbing tie-ins. Dual-wide plans add a day to join the two halves.

After the set

Next come inspections, a walk-through, the punch list, keys, and the warranty packet. Because Marysville is a long I-5 trip from the factory, follow-up visits are scheduled, and we only take the work if we can make those trips. Marysville inspectors still handle occupancy on city lots. Everett is to the south, Arlington to the north, Lake Stevens to the east, and Tulalip west of I-5, each with its own permit office.

What to send

An address is enough to start. It helps to include a survey, a tax-lot and zoning printout, the square footage of the existing house (for the 50 percent test), photos of the backyard and the street approach, and whether the use is family or long-term rental. We’ll check city versus county, the size and bedroom caps, parking, separate utilities, and whether a truck can reach the pad.

Send the address. Tell us city or county and where the building would sit, and we’ll match a model to MMC 22C.185, or to the county rules if your lot is outside the city.

Find your home

Room for the way you live

Compare bedrooms, living space, and the details that matter to you. We’ll help you choose a layout that works with your property.

Planning your budget

The home is one part of the project

Home starting prices outside Portland begin at $85,500 for Model K. Availability and property fit need review.

Starting prices cover the home itself. Your property proposal covers the work needed around it.

Site work, foundation, utility connections, delivery, and installation are quoted for your property. Your written proposal defines the scope, taxes, appliances, and any additional work.

Part of your project How it is priced
Starting price for the home $85,500 (Model K, home only)
Appliances and selected upgrades Priced separately in your proposal
Permitting and local fees Confirmed for your jurisdiction and project
Delivery and installation Quoted for your address, access, and placement needs
Foundation, site work, and utilities Quoted after reviewing the property

Your proposal shows the home price and site work separately. Trench length, septic or sewer work, electrical upgrades, access, foundation, ramps, and delivery distance are reviewed for your property. Taxes, appliances, and work outside the agreed scope are priced separately.

Around the area

Building near Marysville?

Your questions

Building in Marysville

How much does a Wolf ADU cost in Marysville?

Home starting prices outside Portland begin at $85,500 for Model K. Compare the models and home starting prices available for your location. Appliances are not included in the base price. You can purchase our appliance package or provide your own. Permitting, delivery, installation, foundation, utilities, site work, taxes, and upgrades are quoted separately. Installation availability depends on the service area; some locations require a local contractor. Send your address so we can explain the scope for your project.

What’s the difference between an ADU, a tiny home, and a modular home?

An ADU (accessory dwelling unit) is a legal second dwelling on a lot that already has a house — people also call it a granny flat, backyard apartment, or backyard cottage. “Tiny home” usually describes size. Wolf’s smallest widely available plan is the 432-square-foot Model K; the 307-square-foot Model B is limited to the City of Portland. “Modular” describes the construction method: Wolf homes are built to IRC/IBC (International Residential Code / International Building Code) residential code, inspected by Washington L&I or Oregon BCD, and installed on a permanent foundation. They are not HUD manufactured homes.

How big can an ADU be in Marysville?

The city’s ADU Standards FAQ and MMC 22C.185: minimum 200 square feet; maximum 1,000 square feet or 50 percent of the single-family residence, whichever is greater; in no case more than 1,400 square feet. Gross floor area excludes garages, porches, and unfinished basements. Maximum two bedrooms. Height limited to 30 feet. Confirm the current handout when you file.

Is a Marysville mailing address always the city?

No. Pull the parcel. Inside city limits you file with Marysville Community Development. Outside, Snohomish County PDS is the reviewer. Lake Stevens, Arlington, and Everett are other halls. Tulalip is a separate jurisdiction. The mailing address alone won’t tell you which office reviews the permit.

Have you set a Wolf home in Marysville?

Not a named Marysville case study in our library. Marysville is a long I-5 job. We review lots here when we can stand behind warranty at this distance. Send the address, and we will review it under Marysville’s own rules.

Which official pages should I read?

City of Marysville ADU Standards FAQ and MMC 22C.185 for city lots (Community Development, 501 Delta Avenue, 360-363-8000), Snohomish County PDS for unincorporated lots, and the Washington ADU laws guide for HB 1337 and L&I modular inspection.

What does Wolf handle for a Marysville project?

Wolf employees handle property review, design, permitting, factory construction, site work, delivery, installation, and warranty within the agreed project scope. Some projects require third-party services, such as surveys or septic design and installation, depending on the property and jurisdiction.

One point of contact

Long I-5 warranty from a Marysville lot

Marysville is a long I-5 return trip from our factory, which is why the permit, the pad, and warranty have to live on one calendar. Wolf confirms City of Marysville versus Snohomish County, supports MMC 22C.185, runs site work, builds the home, and hauls it past Everett as one job.

Everett and Tulalip each have their own permit rules, so send the parcel and we will confirm which office reviews it before anything else.

Start a free property evaluation.

See what fits on your Marysville property

Share your address and a little about the home you have in mind. We’ll help you understand the space, the work involved, and your next step.

4.9 · 117 Google reviewsVerified on Google Maps September 14, 2026
Where on the property have you pictured it?

The spot you enjoy most is a good place to begin the conversation. Then we check the local rules, the delivery path and utility connections. A mailing address alone doesn’t tell us which jurisdiction reviews the project.

Tell us about the property →