Cle Elum is an upper Kittitas County town with railroad and coal history. It has the Yakima River, pine on the ridges, and a recreation economy built around snow. Roslyn is next door, and Suncadia and the pass-area cabin market share the same weather.
Up here, away from the irrigated valley floor, elevation, snow load, and I-90 closures affect the budget as much as the floor plan does. From the factory, the module climbs Snoqualmie Pass and comes down into town. Or it waits for the pass to open. We plan for both.
Projects inside Cle Elum and projects reviewed by Kittitas County follow different local processes. Washington L&I inspects the home in the factory. The city or county reviews the foundation, placement, and utilities.
Cle Elum or Kittitas County CDS: who reviews it
If the site is inside city limits, you work with the City of Cle Elum Building Department. If it’s outside, the jurisdiction is Kittitas County Community Development Services (CDS). Both publish zoning and building information, and their rules differ.
Roslyn is its own town. South Cle Elum is a separate town across the river with its own hall. People miss that when the GPS says Cle Elum. Confirm the tax lot before you draw a driveway.
Once jurisdiction is settled, the use has to be classified correctly. It might be an accessory dwelling unit, a detached accessory structure, or a guest house. Each category can carry its own standards for setbacks, utilities, and lot coverage. (A setback is the distance a building has to sit from the property line.) Filing under the wrong category can cost you a winter.
Kittitas County’s ADU overview applies on county land. We summarize it in our Kittitas County guide. The zone decides whether an ADU is allowed outright or needs a conditional use permit, which is a separate approval with its own review. The county sets size, proportional-size, setback, and height limits. We get the numbers for your zone from CDS.
Water (well or municipal), septic or sewer, electrical, and emergency access all have to be shown. Also, the owner must live in either the primary residence or the ADU.
Inside Cle Elum city limits, the city’s rules govern. HB 1337’s rules for urban growth areas are covered in the Washington ADU laws guide. The city’s size limit comes from its current code. Mountain towns sometimes treat guest houses and ADUs differently, so we read the current city handout for each address.
How to get a building permit
Mountain modular jobs usually go in this order:
- Confirm jurisdiction. It’s the City Building Department or Kittitas County CDS, based on the tax lot and not the ZIP code.
- Review zoning. Maps tell you whether a secondary dwelling is allowed. They also affect placement, maximum size, and design standards. We still walk the lot for snow storage, trees, and grade.
- Prepare the site plan and building documents. These cover foundation drawings, utility hookups, setbacks, and access routes for delivery. Modular homes must meet Washington State Department of Labor & Industries (L&I) factory-built housing standards. They aren’t HUD-code manufactured homes, which follow a separate federal standard.
- Submit. Cle Elum has accepted building permit applications at City Hall or online. County permits go through Kittitas County’s electronic system. Portals change, so we confirm which one is current.
- Inspections. These cover the foundation, utility connections, and installation. L&I has already inspected the home in the factory, and the local inspector handles the site.
- Final approval and occupancy once inspections close.
Attached ADU, mechanical, electrical, and plumbing permits can still be separate, depending on the scope. Plan for more than one permit.
Snow, pass weather, and building in the factory
Cle Elum’s climate is the practical reason to build modular. Framing a small house outdoors through an upper-county winter means snow load on an unfinished roof and frozen trenches. It also means crews who can’t get there when the pass is closed.
The module is built indoors at the factory, but site work still happens in snow country. That means planning for frost depth and drainage away from the foundation. The roof is designed for the engineer’s snow load at this elevation. Set day, the day the home is placed on its foundation, shouldn’t be the afternoon before a storm.
The east slope gets real wind and freeze-thaw cycles. A driveway that’s fine in August can be a sheet of ice in January. Ground snow load comes from the engineer and the local code. We don’t book a crane when the forecast calls for a pass closure. Roof pitch and snow load are engineered for the elevation. A foundation detail from an Ellensburg valley job shouldn’t be reused here without the engineer’s sign-off.
Our factory is in Battle Ground, in Southwest Washington near Portland, and I-90 is the delivery route from there. Wide-load permits, chain restrictions, and WSDOT closures all go on the calendar. A 12-foot Model K is much easier to get through in winter than a 23-foot Model J or a 28-foot Model L. Two-piece homes need a clear weather window for the day the two halves are joined.
Models people ask for in the upper county
These are modular homes with the L&I insignia, placed on a permanent local foundation.
- Model K (~432 sq ft). A compact retreat, a guest ADU, or a one-bedroom a couple can comfortably live in through the winter. A single-module home helps on wooded or steep access.
- Model J (800 sq ft, two bed, two bath, porch). The two-bedroom for when the lot and the size rule allow a full small house.
- Model L (~984 sq ft). A larger cottage with a real porch and two full baths, when coverage, delivery width, and the proportional-size rule all work.
Model E and Model F are 616 sq ft, two-bedroom, single-module homes. They fit when a 23-foot-wide Model J can’t fit between the trees. We price delivery and site work for your specific property.
Recreation, family, or rental use
Upper-county owners build for different reasons. Some want family space. Some want short-term rentals aimed at trail and snow-sports visitors. Others want a second dwelling that adds value to a land purchase, or a low-maintenance place to downsize. Each use has its own permit and occupancy rules.
Kittitas County’s owner-occupancy requirement on county land can rule out a pure investment cabin. City short-term rental rules are set locally. If your plan is two rental incomes on one lot, tell us up front, because the rules may not allow it. HOA and Suncadia-adjacent design review, where they apply, aren’t covered in the county ADU overview. Let us know about them.
Mountain tiny houses are heavily marketed online. If it has a kitchen and bath, though, the city or county treats it as a dwelling and permits it like one.
Completed Wolf homes are in our case studies.
The upper Kittitas County lot
Cle Elum’s downtown is a small grid of older lots. Expect alley questions and snow piled right where a truck would want to park. Roslyn’s brick commercial blocks and residential streets are tighter still. Unincorporated land toward the pass and toward Suncadia can be gated, steep, or both. A recorded private road may have always worked for a pickup. We still measure its width, grade, and winter maintenance before we’d call it a delivery route.
The coal and railroad history explains the downtown street pattern. It tells you nothing about the septic system on your lot. Recreation demand (hiking, the lakes, snow sports) is why so many owners ask about short-term lodging. That demand doesn’t override Kittitas County owner-occupancy on county land, or the city’s short-term rental rules for your address.
Snow storage belongs on the site plan. A pad that looks huge in July can be the plow pile in January. We want to know where the snow goes before we lock in a foundation location.
Water, septic, and power
A city water and sewer connection in town is the simple version. Outside city limits, you’re often on a well and septic. Adding a second dwelling raises capacity questions with the health department, and winter makes those harder. A system sized for a cabin that sleeps two won’t automatically handle a two-bedroom ADU. When new wells and new septic systems are required, they have their own permit timelines. Those timelines don’t bend around ski season.
Electrical service on older mill-town blocks and on raw land call for different upgrades. A cabin site with a long private drive may need a new transformer. Emergency access in snow is a specific county concern. If the driveway can’t take a fire truck in February, the site needs work before the project can go forward.
Cost
The models page shows starting home prices. Your proposal adds upgrades, taxes, permits, mountain-pass delivery, a snow-country foundation, and any well or septic work. All of that is priced for your property. A free property evaluation is the first step.
Financing is typically a HELOC, a cash-out refinance, or a construction lender. Mountain second homes sometimes go through different underwriting than a primary-residence ADU. See financing for details.
Nearby towns
Roslyn is a separate town with its own hall. Ellensburg is about forty minutes down the valley, with the college, irrigated farmland, and less snow. Yakima is in another county. Snoqualmie Pass is a recreation area without its own building department. If the lot is at the pass or in unincorporated ski country, confirm the jurisdiction first. Suncadia-adjacent design review and a downtown Cle Elum alley lot need different checklists.
What we check first
- Is it City of Cle Elum, South Cle Elum, Roslyn, or unincorporated Kittitas County?
- Is it an ADU allowed outright, a conditional use, or a “guest house” under a different category?
- Does the owner-occupancy rule fit the intended ski-rental or family use?
- Does the well and septic, or city service, have capacity, including in winter?
- Can the module legally and physically make it over the pass and down the driveway?
- Would a narrower footprint avoid a constraint that a two-piece home would trigger?
The free property evaluation answers the jurisdiction, zoning, and occupancy questions. Utility capacity, the haul, and the driveway get worked out as the project moves forward.
If you already know the driveway is a winter problem, tell us. We can redesign access or suggest a narrower model, so you aren’t waiting until June for a Model J to arrive.
After the set
Next come inspections, the punch list, keys, and warranty. Punch-list visits come back over the pass on a scheduled day.
Send the address, and include photos of the driveway in winter if you have them. Summer photos can hide the real access problems. We’ll match the model to your elevation and your permit office.