Skip to main content
Explore
Contact Us

Klickitat County

ADU (accessory dwelling unit) builder in White Salmon, Washington

White Salmon sits on the Washington side of the Gorge across from Hood River. City lots and Klickitat County lots go through different reviews, and wind and steep grades shape both delivery and siting.

Wolf modular cottage with cream siding, a shed roof, and ramp entry in Oregon City, Oregon
White Salmon, Washington — Wolf employees handle the project from permits through installation.

Getting started

Let’s start with your plans

  • The City of White Salmon and Klickitat County have separate permit counters, and Bingen has its own city hall.

  • Gorge delivery uses SR-14 or the Hood River Bridge, and wind restrictions can delay a move.

  • We don’t have a White Salmon case study yet. Send us the parcel and we’ll review it.

White Salmon sits on the Washington side of the Columbia River Gorge, across the river from Hood River. It’s a hillside town, with the wind that draws windsurfers and kiteboarders, slopes that people underestimate, and a main street that looks across at Oregon. The City of White Salmon has its own permit counter, Klickitat County has another, and Bingen, down the hill by the mill and the rail line, has a third. A White Salmon mailing address can fall under any of them. Lyle is a separate town downriver.

Our factory is in Battle Ground, near Vancouver, WA. Delivery runs east on SR-14 through the Gorge, or out I-84 to the Hood River Bridge and up the Washington side. Both routes have wind restrictions, so a White Salmon set takes more scheduling than one in Clark County.

We don’t have a White Salmon case study in our library yet. The closest is a Lyle vacation home, a few miles downriver.

City of White Salmon, Klickitat County, or Bingen

Look up the parcel before you sketch a backyard plan. If the lot is inside White Salmon city limits, the city’s planning and building staff handle the file. If it isn’t, you’re in unincorporated Klickitat County, even if your mail says White Salmon. If the lot is in Bingen, Bingen’s city hall reviews it under Bingen’s own code. Husum, BZ Corner, and Trout Lake are unincorporated county communities, not part of the city.

Washington law allows two ADUs on qualifying properties in urban growth areas. The available space, utility capacity, and any protected areas still affect what you can build. See the Washington ADU laws guide and the Klickitat County ADU rules guide. We coordinate the permit application with the local building department. Hood River follows Oregon law, so its requirements differ from those in White Salmon.

City lots: WSMC Chapter 17.64

White Salmon Municipal Code Chapter 17.64 is the city’s ADU section. The city has been amending Title 17, so check the current version when you file. The published standards say:

  • The ADU overlay applies to all residential zoning districts.
  • An ADU can be inside, attached to, or detached from the main house.
  • You can have up to two ADUs in RL, R1, and R2, and up to three in R3. In the C district, up to three if they don’t face a commercial street.
  • The minimum lot size is 2,000 square feet, and the lot still has to meet parking and the other development standards.
  • An ADU’s gross floor area, measured finished wall to finished wall, can’t exceed 100 percent of the main house’s gross floor area, not counting the garage and detached accessory buildings.
  • The minimum unit size is 200 square feet, or whatever the adopted building code requires, even if that’s larger than the maximum when the main house is very small.
  • Parking: one additional on-site space with an ADU in RL, R-1, and R-2, and a half space per ADU in R-3 and C, with a minimum of one. The main house still has to keep its Chapter 17.72 spaces.
  • The ADU has to use the same driveway as the main house unless the planning commission grants a special approval.

Building permits are required. Older versions of the ordinance required an owner-occupancy letter, so check whether that’s still in 17.64 or has been removed to match HB 1337’s ban on owner-occupancy mandates inside UGAs. State law sets the minimum inside the UGA, and the current WSMC is what you file under.

We don’t list a single citywide setback because RL, R1, R2, and R3 each have their own. Slope and wind can also shrink the usable part of a backyard that looks roomy on paper.

County lots: Klickitat County

Unincorporated Klickitat County doesn’t use 17.64. Under the county rules, ADUs are allowed in named single-family zones through an administrative conditional use. The county allows one ADU per main house, with no other existing dwellings on the parcel, and publishes a two-bedroom cap. The floor-area limit has changed in past ordinance text, so we confirm the current number. A detached unit has to sit within 200 feet of the main house. The ADU has to use the existing well (no new well), and the parcel has to hold primary and reserve septic for both units. The county also requires owner occupancy, prohibits short-term rentals, and requires one extra parking space, the same driveway with no new road approach, and a recorded covenant.

None of those county conditions apply to a typical lot inside White Salmon, and the city’s 100 percent size rule doesn’t apply on a county lot. County parcels toward Husum usually bring the well, septic, and conditional use steps into play.

Wind, slope, and the last mile

Gorge wind affects the set day directly. It limits when a crane can lift, how a module is held in place on a slope, and whether a truck can safely climb a switchback in a gust. Building a house on site on a windy, wet Gorge slope means months of outdoor work. A modular home still needs a prepared pad, but the house itself is built indoors at our factory.

Slope is the other constant. In-town lots can be much steeper behind the house than they look from the street. Around Jewett Creek, on the bluff above Bingen, and on the streets that climb off Main, you’ll see retaining walls, stepped yards, and driveways a pickup can handle and a modular trailer can’t. We check:

  • Driveway grade and turning radius.
  • Overhead lines and fir trees in the only path a crane can swing through.
  • Whether the lot fits a 12-foot-wide Model K or can take a wider two-bedroom.
  • Where to stage on a street that already carries tourist and mill traffic.

Wind closures on the Hood River Bridge and the timing rules for oversize loads go into the delivery schedule. We use White Salmon’s local wind, snow, and seismic values in the permit packet rather than a generic factory number.

How a White Salmon permit moves

White Salmon has a small permit counter, and incomplete site plans, missing parking, or unresolved access questions get sent back. We work in this order:

  1. Confirm the tax lot is in the City of White Salmon, not Bingen, the county, or Hood River.
  2. Confirm the zone (RL, R1, R2, R3, or C) and how many ADUs 17.64 allows there.
  3. Draw the plot plan: the existing house, the new cottage, the zone’s setbacks, parking, the shared driveway, utilities, and a truck or crane path that works on the grade.
  4. Prepare the engineered modular plan set with local wind, snow, and seismic values. Our homes are modular, built to the Washington State Building Code, inspected by L&I in the factory, and shipped with an L&I insignia. They aren’t HUD (the federal standard for manufactured homes) manufactured homes. The city still reviews the foundation, placement, and utilities.
  5. Submit to the city, or to Klickitat County if the lot is unincorporated. County files add a pre-submission meeting and the administrative conditional use.
  6. Call inspections as the work progresses, then get occupancy. Keep the approved drawings on site.

A typical city submittal includes the application, a site plan showing property lines and setbacks, floor plans, parking, and how water and wastewater will be handled. County files add neighbor notice, the 200-foot siting rule, well certification, primary and reserve septic, and the recorded covenant.

Across the river in Hood River or The Dalles, Oregon permits and Oregon’s modular program apply.

Lots we see

Downtown and the older grid around Main and Jewett can be tight, with short lots, on-street parking, and a slope that starts one lot back from the sidewalk. The benches above town have more room but can bring HOA (homeowners association), tree, and drainage questions. Toward Bingen the ground drops toward the mill and the tracks. Toward the county line you start seeing wells, septic, and longer driveways.

Most in-city lots are on city water and sewer. That still means running laterals, adding a cleanout, and checking whether the electrical panel can handle a second home. Outside the city you’re usually on a well and septic, with the county’s existing-well and reserve-septic rules. If you don’t know which you have, that’s the first thing we check.

Basalt, slope, and winter runoff all affect excavation. Summer is the easiest time to set a home here. Winter sets need tighter site control and close attention to wind on the bridge.

Models

  • Model K (~432 sq ft): a one-bedroom ADU that fits most in-town and hillside lots.
  • Model E or Model F (~616 sq ft): two bedrooms, when the zone, the grade, and the truck path all allow it.
  • Model J (~828 sq ft) or Model L (~984 sq ft): when the city’s size limit and lot coverage still leave room.

On city lots, the maximum ADU size is 100 percent of the main house, which can be more than the state’s 1,000 square foot minimum cap on a typical house. That doesn’t mean every RL lot can take a Model L, so we measure the existing house, the pad, and the truck path first. County lots use the county’s published size cap and two-bedroom rule instead.

ADU, tiny home, or Gorge cottage

If it has a kitchen and bath, White Salmon treats it as a dwelling. On city lots, most owners build for family or a long-term rental. Short-term rentals fall under separate city chapters (WSMC 17.57 and 5.02), so an ADU permit doesn’t automatically let you rent nightly. On county lots, Klickitat County prohibits short-term rental of both the ADU and the main house and requires owner occupancy. Tell us how you plan to use the home during the evaluation.

Cost and timeline

The model sets the starting price of the home. Trench length, retaining walls, electrical capacity, hillside foundation work, and the Gorge haul set the rest. Building indoors keeps the home out of Gorge weather, but city review and site prep still drive the schedule.

The Model K starts at $85,500 for the home itself. Permitting, delivery, installation, and site work are listed separately in your property-specific proposal. A bluff lot that needs retaining will cost more than a level in-town pad. See the Washington ADU cost guide and financing, or request a property evaluation.

Site work and set day

A normal White Salmon job includes foundation excavation, trenching, grading, and minor tree work so the home can sit where it needs to. A hillside last mile off Jewett is why we look at access early. We bring the home on a standard delivery trailer and add a crane when the lot needs one. We weather-seal the same day when we can, then finish the mechanical and plumbing hookups. Two-section homes like the J and L take an extra day to join the halves.

What to send

An address is enough to start. It helps to also send a survey, a tax lot and zoning printout, the square footage of the existing house, photos of the backyard and the street approach that show the grade, and how you plan to use the home (family, long-term rental, or a cottage you might live in). We’ll check city, county, or Bingen, how many units 17.64 allows, parking, and whether a truck can reach the pad.

After the set

After the set come inspections, the walk-through, the punch list, keys, and the warranty packet. Because the factory is a Gorge drive away, follow-up work is a scheduled return trip. On city lots, White Salmon inspectors sign off on occupancy. Keep the approved drawings on site until they do.

Send the address. Tell us whether the lot is in the city, the county, or Bingen if you know, where you’d put the home, and whether it’s for family, a rental, or a cottage you might live in. We’ll match a model to WSMC 17.64, or to the Klickitat County rules if that’s where your lot is.

Find your home

Room for the way you live

Compare bedrooms, living space, and the details that matter to you. We’ll help you choose a layout that works with your property.

Planning your budget

The home is one part of the project

Home starting prices outside Portland begin at $85,500 for Model K. Availability and property fit need review.

Starting prices cover the home itself. Your property proposal covers the work needed around it.

Site work, foundation, utility connections, delivery, and installation are quoted for your property. Your written proposal defines the scope, taxes, appliances, and any additional work.

Part of your project How it is priced
Starting price for the home $85,500 (Model K, home only)
Appliances and selected upgrades Priced separately in your proposal
Permitting and local fees Confirmed for your jurisdiction and project
Delivery and installation Quoted for your address, access, and placement needs
Foundation, site work, and utilities Quoted after reviewing the property

Your proposal shows the home price and site work separately. Trench length, septic or sewer work, electrical upgrades, access, foundation, ramps, and delivery distance are reviewed for your property. Taxes, appliances, and work outside the agreed scope are priced separately.

Around the area

Building near White Salmon?

Your questions

Building in White Salmon

How much does a Wolf ADU cost in White Salmon?

Home starting prices outside Portland begin at $85,500 for Model K. Compare the models and home starting prices available for your location. Appliances are not included in the base price. You can purchase our appliance package or provide your own. Permitting, delivery, installation, foundation, utilities, site work, taxes, and upgrades are quoted separately. Installation availability depends on the service area; some locations require a local contractor. Send your address so we can explain the scope for your project.

What’s the difference between an ADU, a tiny home, and a modular home?

An ADU (accessory dwelling unit) is a legal second dwelling on a lot that already has a house — people also call it a granny flat, backyard apartment, or backyard cottage. “Tiny home” usually describes size. Wolf’s smallest widely available plan is the 432-square-foot Model K; the 307-square-foot Model B is limited to the City of Portland. “Modular” describes the construction method: Wolf homes are built to IRC/IBC (International Residential Code / International Building Code) residential code, inspected by Washington L&I or Oregon BCD, and installed on a permanent foundation. They are not HUD manufactured homes.

How many ADUs can a White Salmon city lot have?

Under WSMC 17.64, up to two ADUs in RL, R1, and R2, and up to three in R3 (and in the C district if the ADUs don't face a commercial street). The minimum lot size is 2,000 square feet. Each unit can be up to 100 percent of the primary dwelling's gross floor area, not counting the garage and detached accessory buildings. Check the current WSMC when you file.

Is a White Salmon mailing address always the city?

No. Look up the parcel. Inside city limits you file with White Salmon. Outside, Klickitat County is the reviewer, usually through an administrative conditional use with a 200-foot siting rule, owner occupancy, and a short-term rental ban. Bingen has its own city hall, and Lyle is a separate town downriver.

Have you set a Wolf home in White Salmon?

We don't have a White Salmon case study in our library yet. We do have a Lyle vacation-home case study, but Lyle is a different town downriver. White Salmon is inside our Washington turn-key service area, so send us the parcel and we'll review it.

Which official pages should I read?

White Salmon Municipal Code Chapter 17.64 for city lots, our Klickitat County ADU rules guide for unincorporated lots, the Washington ADU laws guide for HB 1337 and L&I modular inspection, and the Hood River and The Dalles pages if the lot is actually in Oregon.

What does Wolf handle for a White Salmon project?

Wolf employees handle property review, design, permitting, factory construction, site work, delivery, installation, and warranty within the agreed project scope. Some projects require third-party services, such as surveys or septic design and installation, depending on the property and jurisdiction.

One point of contact

SR-14 and a White Salmon hillside set

White Salmon's wind, grades, and bridge delivery fall under Washington and Klickitat County rules, not Oregon's. Wolf confirms whether your lot is in the city, the county, or Bingen, supports the WSMC 17.64 permit on city lots, handles the site work, builds the home in our factory, and delivers it by SR-14 or the Hood River Bridge as one planned sequence.

Send us the tax lot and we'll start there.

Start a free property evaluation.

See what fits on your White Salmon property

Share your address and a little about the home you have in mind. We’ll help you understand the space, the work involved, and your next step.

4.9 · 117 Google reviewsVerified on Google Maps September 14, 2026
Where on the property have you pictured it?

The spot you enjoy most is a good place to begin the conversation. Then we check the local rules, the delivery path and utility connections. A mailing address alone doesn’t tell us which jurisdiction reviews the project.

Tell us about the property →
Ask Wolf

Ask Wolf

A little help finding your home.

Ask about Wolf homes, rentals, your property, or caring for your home. Answers link to Wolf’s published information.

AI-assisted answers. Please leave out personal details.